>
Nancy Pelosi has officially announced her RETIREMENT at the end of her term, January 3, 2027.
Omeed Malik: The Technocrat Muslim Billionaire Inside MAGA
Democrat-led government shutdown is now causing flight delays, threatening air traffic control,...
HUGE 32kWh LiFePO4 DIY Battery w/ 628Ah Cells! 90 Minute Build
What Has Bitcoin Become 17 Years After Satoshi Nakamoto Published The Whitepaper?
Japan just injected artificial blood into a human. No blood type needed. No refrigeration.
The 6 Best LLM Tools To Run Models Locally
Testing My First Sodium-Ion Solar Battery
A man once paralyzed from the waist down now stands on his own, not with machines or wires,...
Review: Thumb-sized thermal camera turns your phone into a smart tool
Army To Bring Nuclear Microreactors To Its Bases By 2028
Nissan Says It's On Track For Solid-State Batteries That Double EV Range By 2028

Elon Musk first shared his vision for the company in December 2016, promising to solve traffic woes with networks of tunnels for city centers. It is now adding the finishing touches to its first burrow, a test track running beneath the city of Los Angeles.
By shrinking the size of tunnels, automating the machines that dig them while also powering them up, The Boring Company is hoping to cut the costs of tunneling by a factor of more than 10. It also plans to turn the excavated rock into Lego-style bricks for low-cost housing.
It has also proposed a network of tunnels for LA that would connect locations like Long Beach Airport, the downtown area, LAX, UCLA and Dodger Stadium. But first it's all about baby steps, with the company getting to work on its first test tunnel that begins at its headquarters in LA.