>
Woman flies to Seattle to show how all the businesses have left their downtown...
James Freeman ILLEGAL ARREST DROPPED & HUGE LAWSUIT
Jamie Kennedy blasts LA mayoral election swing: 'Literal crime scene'
Here we go, the Los Angeles Times is admitting that yes, tens of thousands of mail in ballots...
World's longest-range airliner takes to the skies
Batteries That Use Sodium Instead of Lithium Could Be Low-Cost Rival to Tesla's
Elon and SpaceX Have Made AI Training 10 Times Faster
Oklo COO Says Nuclear Waste Could Power America For 150 Years
SpaceX Announces LARGEST Starship Mission Ever! They've never done this before!
Cars Are Fast Becoming Dystopian Prison Pods...
Our Emergency Water Plan Wasn't Good Enough - So We Built This
Sodium Ion Batteries Can Reach 100 Gigawatt Per Hour Per Year Scale in 2027
Juiced Bikes proves capable electric motorcycles don't have to cost a lot

France also had a shutdown of some nuclear reactors because of concerns over japanese parts The component in question was manufactured by Japan Casting and Forging Corp., which is based in Kitakyushu. In June, ASN pointed to potential weaknesses of the Japanese steel components, with carbon concentrations exceeding standards. The Japanese part is used at 12 nuclear reactors in France, according to local reports. In June, the French regulator, the Autorité de Sûreté Nucléaire (ASN), said it had identified 18 French nuclear power reactors operated by EDF - of both 900 MWe and 1450 MWe capacity - whose steam generators could contain high carbon concentrations.
Only three nuclear reactors are currently online in Japan: two at the Sendai plant and one at Shikoku Electric Power's Ikata station.
Japan's Institute of Energy Economics said Dec. 13 it estimates seven reactors will be restarted by the end of March 2017 and another 19 by March 2018.
About two-thirds of 57 nuclear reactors under construction are expected to come on line in the next three years.