>
AI-Powered "Digital Workers" Deployed At Major Bank To Work Alongside Humans
New 'Mind Reading" AI Predicts What Humans Do Next
Dr. Bryan Ardis Says Food Producers Add 'Obesogens' to Food and Drugs to Make Us Fat
Health Ranger Report: Team AGES exposes Big Pharma's cancer scam and threats from AI
xAI Grok 3.5 Renamed Grok 4 and Has Specialized Coding Model
AI goes full HAL: Blackmail, espionage, and murder to avoid shutdown
BREAKING UPDATE Neuralink and Optimus
1900 Scientists Say 'Climate Change Not Caused By CO2' – The Real Environment Movement...
New molecule could create stamp-sized drives with 100x more storage
DARPA fast tracks flight tests for new military drones
ChatGPT May Be Eroding Critical Thinking Skills, According to a New MIT Study
How China Won the Thorium Nuclear Energy Race
Sunlight-Powered Catalyst Supercharges Green Hydrogen Production by 800%
Designed to power the world's first operational Single-Stage-To-Orbit (SSTO) satellite launcher, the engine took only 60 days to complete from when fabrication began.
Over the past 60 years, space launches have become pretty routine. The first stage ignites, the rocket lifts slowly and majestically from the launch pad before picking up speed and vanishing into the blue. Minutes later, the first stage shuts down and separates from the upper stages, which ignite and burn in turn until the payload is delivered into orbit.
This approach was adopted not only because it provides enough fuel to lift the payload while conserving weight, but also because the first-stage engines, which work best at sea level, are very inefficient at higher altitudes or in space, so different engines need to be employed for each stage of flight.