>
Windows 10 is DEAD in 2025? -- Here's How I Run It SAFELY Forever (No Updates)
GENIUS ACT TRIGGERED: The Biggest BANK RUN in History is COMING – Prepare NOW
European Billionaires Funneled $2 Billion into NGO Network to Fund Anti-Trump Protest Machine
Japan Confirms Over 600,000 Citizens Killed by COVID mRNA 'Vaccines'
HUGE 32kWh LiFePO4 DIY Battery w/ 628Ah Cells! 90 Minute Build
What Has Bitcoin Become 17 Years After Satoshi Nakamoto Published The Whitepaper?
Japan just injected artificial blood into a human. No blood type needed. No refrigeration.
The 6 Best LLM Tools To Run Models Locally
Testing My First Sodium-Ion Solar Battery
A man once paralyzed from the waist down now stands on his own, not with machines or wires,...
Review: Thumb-sized thermal camera turns your phone into a smart tool
Army To Bring Nuclear Microreactors To Its Bases By 2028
Nissan Says It's On Track For Solid-State Batteries That Double EV Range By 2028

Nextbigfuture interviewed Christofer Mowry, CEO of General Fusion in May, 2018 at the C2 conference in Montreal. Christofer Mowry indicated that General Fusion was working to get funding and complete a 70% scale pilot plant that will prove out the viability of generating electricity from General Fusion's magnetized target nuclear fusion. He indicated that the scale pilot could be completed around 2023.
If the scale pilot plant is successful then General Fusion would raise the funds for a commercial plant.
General Fusion does not need to demonstrate fusion containment because they are pulsed power system like a diesel engine or steampunk fusion.
The pilot system will prove three things:
1. Fusion conditions will be repeatably produced
2. There will be a kill chain from neutrons to electrons
3. Economics will be validated.