>
Is Yen Carry Trade's unwind about to trigger a repo market meltdown? Let's dive into the mec
Chairman Rand Paul Releases New Report Revealing Hundreds of Billions...
Get Schiffty Music Video | Rick and Morty | Adult Swim
This tiny dev board is packed with features for ambitious makers
Scientists Discover Gel to Regrow Tooth Enamel
Vitamin C and Dandelion Root Killing Cancer Cells -- as Former CDC Director Calls for COVID-19...
Galactic Brain: US firm plans space-based data centers, power grid to challenge China
A microbial cleanup for glyphosate just earned a patent. Here's why that matters
Japan Breaks Internet Speed Record with 5 Million Times Faster Data Transfer
Advanced Propulsion Resources Part 1 of 2
PulsarFusion a forward-thinking UK aerospace company, is pushing the boundaries of space travel...
Dinky little laser box throws big-screen entertainment from inches away
'World's first' sodium-ion flashlight shines bright even at -40 ºF

The Boring Company Vegas Loop will be underground tunnels stretching as far north as downtown Las Vegas, throughout the Strip corridor, and as far south as the Allegiant Stadium, pending approval later this week by the Stadium Authority, the owner of the stadium. Passengers will be whisked through tunnels in all-electric Tesla vehicles.
The $52 million Convention Center Loop should be completed this January. It will connect the existing 3.2 million square foot Las Vegas Convention Center to its $980 million West Hall expansion. There is also an approved expansion to the nearest casinos.
The permits should be granted early in 2021 and the section from the convention center to the strip could open as early as 2023.
This transportation system of the future could become another attraction for tourists.