>
"IT'S THE END OF THE WORLD!!!"
Who Knew Genocide Could Be So Expensive?
Trump Confirms "ICE Enforcement Proceedings" Being Taken Against Ilhan Omar
RED ALERT FOR AMERICA: While US Is Currently Obsessed With Trump,...
High-voltage sodium home battery emerges as affordable rooftop solar solution
Peter Thiel-Funded Company Anduril to Triple the Number of Autonomous Surveillance...
China has released Origin Pilot, claimed to be the world's first open-source operating system...
ShieldAI XBAT Drone Fighters Can Give A Fighter Drone Wing to Every US Destroyer
Brain organoids, kept alive more than five years, matured like human brains
Parkinson's patient's tremors VANISH within minutes of GROUNDBREAKING treatment
Polaris injects pneumatic shifting into expedition-grade side-by-side
NEW HOMES ARE BUILT WITH THIS AND IT'S MAKING YOU SICK
S3E33: I Beat the Attorney General. No Lawyers. My Legal Team Was AI

This means Tesla will have 4680 at reasonable scale and car ready in 2021. This is not the 12-18 month timeframe from the last earnings call. This means not 11-17 months from today but less than 7 months. This is also confirming Texas production later this year.
Texas will also have front and rear gigacasting.
The 4680 cells means the Model Y from Austin will have the structural battery. The front and rear casting will massively reduce cost and weight. There will also be weight reduction from the structural battery. These all combine for a lighter, lower cost and longer range vehicle.
Having large-scale 4680 cells will mean Tesla will have the battery supply for Cybertruck and Semi products at scale in 2022.