>
Spokane Fire: Prepping Our Equipment to Head Out
80x Bigger Than Enron: $5.1 Trillion Fraud That Can Collapse Treasuries, Spark Civil War
Amish community fined nearly $500,000 for failing to download ArriveCan app
Iran Issues Six Demands on the US to Re-Open the Strait
EG4 Power Pro VS Ruixu Lithi VS Yixiang Budget Battery! Best Selling Battery Showdown!
Insect wings can kill bacteria without any chemicals!
5th Small Modular Reactor Validated Since June, Poised For Mass Production
Tesla Never Made An Electric Jet Boat, So This YouTuber Built One Himself
What could possibly go wrong? Scientists use AI to design new viruses
Dual-motor suitcase drive underpins 3,000-hp hypercar
DoorDash Wins Federal Approval To Fly Its Own Delivery Drones
Shade-Resistant Solar Cells Retain 97% Efficiency After 2,000 Hours of Testing
20 Ancient Engineering SECRETS
Stonehenge Was Reanalyzed by AI -- And the Findings Are Hard to Explain

The new record is one in a series of strides Fervo is making to produce affordable, usable, clean power through a process using an enhanced geothermal system (EGS). Last year, Project Red passed its 30-day well test and was able to produce 3.4 megawatts (MW) of power, roughly the energy used by 500 US households. In November, Google announced that the plant was fully operational and connected to the same grid in Nevada to which some of Google's data centers are linked. Fervo is now developing an even larger project in Utah that aims to come online in 2026, and reach its full capacity for pumping out 400 MW of non-stop power in 2028. The wells it is drilling there are even hotter and over 2,100 feet (640 meters) deeper than those from Project Red, so the faster drilling time is even more impressive.