>
The Trump White House is starting to admit that your bank account and airline tickets...
iCloud, App Store, and other Apple services hit by ongoing outage
Every TV and radio in the country is going to play the emergency alert tone today. Your phone won
China used more coal in just four years than the entire world did in the coal-heavy 19th century
SpaceX Just Caught Starship on Its FIRST Attempt!
Solid-State Cells Can Make The U.S. Competitive In Batteries Again: CEO
Jetson ONE personal eVTOL pod is about to go full sky patrol
America's INSANE BREAKTHROUGH Could Replace Septic Tanks Forever
Amazing DIY Building Material for Home & Yard - Inexpensive and Easy!
Researchers have discovered a massive deposit of hidden water...
Amazon's Ring Unveils Flying Drone And Robot To Patrol Homes And Businesses
Anthropic Strikes $3.4 Billion Off-Grid Power Agreement to Bypass U.S. Grids, Reports Say
The X-ray room just shrank to the size of a laptop
Gritt and MasTec partner to bring physical AI to solar construction sites

For the first time in American history, the Department of Energy has approved a commercial nuclear microreactor's safety analysis for full-power operations.
LA-based Radiant secured the approval, with testing planned at Idaho National Laboratory.
With the Kaleidos DSA approved, Radiant is cued for DOE's Readiness Review, which will assess whether Kaleidos and the team responsible for operating it are prepared to begin nuclear operations. Following successful completion of the review, Radiant will fuel Kaleidos and begin its five-phase test campaign at the National Reactor Innovation Center's Demonstration of Microreactor Experiments (DOME) facility at INL.
The campaign will progress from first criticality through increasingly higher-power operation, culminating in at least 150 hours of continuous operation at full power without operator intervention.
The approval follows DOE's February 2026 approval of Radiant's earlier Preliminary Documented Safety Analysis (PDSA) submission.
Radiant built Kaleidos at its El Segundo, California facility and shipped it to INL in August 2026. The DOME campaign is a key step toward Radiant's plan to manufacture Kaleidos at its R-50 facility in Oak Ridge, Tennessee, and deliver its first commercial units to Buckley Space Force Base and Fort Benning in 2028. Earlier this month, Radiant was selected by the U.S. Navy to deploy Kaleidos at Naval Weapons Station Crane in Indiana.
Radiant plans to deliver 15 reactors to the US military by 2030. Radiant has signed a commercial agreement with Equinix for 20 Kaleidos units and was selected by the Department of the Air Force and Defense Innovation Unit to develop and operate a microreactor at Buckley Space Force Base.
August 26, 2026 — Radiant, the company building the world's only plug-in ready, transportable commercial nuclear microreactors, today announced that the U.S. Army, in partnership with the Defense Innovation Unit (DIU), has executed a binding agreement totaling up to $750 million dollars to develop and deploy 15 Kaleidos nuclear microreactors through the Army's Janus Program. Radiant's award is one of the largest contracts ever issued by DIU across their portfolio, and the largest award within the Janus Program.
Kaleidos is a 1-megawatt nuclear microreactor, transportable by land, sea, or air and deployed directly at customer sites. Plug-in ready, each reactor provides up to five years of power before refueling and is engineered with a 20-year operating life cycle. Unlike permanently installed nuclear facilities that require long lead times and site-specific construction, Kaleidos provides energy in a box. It requires no cooling water, and it is not a "hole-in-the-ground" reactor. The reactor arrives as a sealed, fueled unit that can be plugged in immediately. Additional units can be added or relocated as energy requirements evolve. Radiant manages fueling, refueling, and spent-fuel storage at its own facilities, allowing customer sites to return to greenfield condition, within two years or less after a unit is removed. Customer sites never have onsite spent fuel storage.
Radiant's Kaleidos reactor is undergoing the country's most rigorous test campaign at the Idaho National Laboratory DOME facility, which was updated for small modular reactor testing in 2026. Following a competitive selection process, the Department of Energy awarded Radiant exclusive access to the facility for a full year. Kaleidos is undergoing the industry's only full-scale, full-power, extended duration reactor test- using the same reactor design and custom spec'd fresh fuel that will be used for customers deployments.